Library and SOPs
The Library keeps your farm's standard operating procedures (SOPs) and contract files in one place. This page covers writing and uploading SOPs, keeping every revision, attaching SOPs to jobs and organizing documents in folders.
Know what the Library holds
Open Library, then Documents. SOPs and contract documents share one list, and the filters All, SOPs and Contract documents narrow it.
- SOPs are visible to people with access to Operations. Contract documents are visible to people with access to Sales.
- If someone can't see a type of document, they don't see its names or how many there are.
- Putting a document in a folder never gives anyone access to it.
Work templates live in Work, and contract templates live in Sales. See Work orders and Sales.
Write an SOP in Kernl
- In Documents, choose New, then Write SOP.
- Give the SOP a name and write the instructions. The toolbar covers headings, lists, tables, links and everyday formatting.
- If the crew should tick off steps, choose Add checklist and add each step in order.
- Choose Preview to read it the way the crew will.
- Choose Create SOP.
Only checklist steps can be ticked on a job. Bullet points in the instructions stay as ordinary text.
Upload an SOP you already have
In Documents, choose Upload documents, then SOP or instructions. Kernl accepts PDF, Word (.docx), JPG and PNG files up to 5 MB each. You can choose several files at once and review their names before they're saved.
PDFs and images open right in Kernl. Word files can be downloaded but don't preview in Kernl.
Revise an SOP without changing past jobs
Open the SOP and choose Revise SOP. When you choose Save new revision, the earlier revision stays on record with its author and date.
- Jobs keep the exact revision they were linked to. New wording never replaces it on its own.
- If you open an older revision from a job, View latest revision shows the current wording. To move the job onto it, edit the job's SOPs and choose Use latest revision.
- Archive SOP takes an SOP out of new choices. Jobs that already use it can still read it, and Restore SOP brings it back.
Attach an SOP to a job
Open the job and choose Add in its SOPs section, then pick one or more SOPs. The job links the revision you chose. You can also start from the SOP itself: Create work opens a new job with that SOP already attached.
If the SOP has a checklist, the job shows its steps for the crew to tick. The ticks belong to that job only. The SOP and other jobs don't change.
Ticking every step doesn't complete the job. Someone still chooses Complete work, and a closed job needs to be reopened before its ticks can change.
SOPs can also be part of a work template, so each season's jobs come with the same instructions.
Talk through an SOP with the team
Each SOP revision has its own comments. Type @ and choose a person to mention them; they get a notice in Kernl and an email saying they were mentioned.
Comments stay with the revision they were written on, so a discussion about old wording doesn't follow it onto new instructions. Only the author can edit or remove a comment.
Keep documents organized
Use New folder to group documents your way, such as by season, yard or machine. Folders can sit inside other folders, and you can rename or move them. Only empty folders can be deleted.
Search finds documents by name. List view and Grid view show the same documents, and you can switch between current and archived documents.
Select several items to act on them together:
- Move them to a folder.
- Copy links. A link opens only for people who already have access.
- Download SOPs and contract files as one ZIP file, up to 100 MB.
- Archive or Restore them.
Delete permanently is only for items nothing else relies on, such as an SOP no job has used. An SOP a job relies on, or a contract that was signed or sent, stays protected. You can archive it instead.